Synchro Case Studies
Synchro has been used on many diverse projects. Please follow the links provided for a closer look at different case studies:
Project: Anaheim Replacement Hospital
"Time to draw the CMU bracing=1 hour Time to incorporate it into the Synchro Model=5 minutes Time to find the conflicts=30 seconds Time and headaches saved out in the field=Priceless!"
[Read More]
Project: Sacramento International Airport's Terminal B
"Synchro assisted us in demonstrating our knowledge of the project and our ability to solve key issues through the use of 4D simulation. Synchro is an extremely efficient tool that helped us illustrate the effectiveness of how the Turner Team would be
[Read More]
Project: UCSF Cardiovascular Research Institute
"We used Synchro's 4D BIM schedule simulation to communicate among the project stakeholders the complex construction sequences and site logistics. The ability to see clearly the schedule sequences creates
[Read More]
Project: Wuskwatim Power Generating Station
"The multiple views -- the bird's eye and plan views -- are key to showing the overall picture. In some high impact decisions it really helps to bring everyone onto the same page." -- John Cassano, P.ENG Schedule and Cost Control Engineer, Wuskwatim Engineeri
[Read More]
Project: The Shard at London Bridge
"Synchro provides the graphic simulation needed to deliver and improve construction solutions for our clients, along with a real time based 4D model for idea generation and problem solving within the project team." -- Rob Owen, Director at Mace Group Ltd, using Synchro for Tate
[Read More]
Project: Maricopa County Downtown Court Tower, Phoenix, AZ
"To visually illustrate the concrete wall pour schedule to the sub-contractors, I imported a shop drawing PDF into Google SketchUp, created a model off of it, and then imported the 3D SketchUp model and the Oracle Primavera P6 schedule into Synchro where the
[Read More]
Project: BIM Commercial Construction Projects
"I hear a lot that there are things you just can't see. Synchro allows us to take the model, assemble it, put it to a schedule and analyze it. Synchro helps visualize potential problems and allows you to better assess the situation at any given t
[Read More]
Project: Revel Entertainment's $2 Billion Atlantic City Casino
"While it's possible to create an image of a building in your mind, to see it take shape on screen, in sequence, creates a much more effective shared understanding with the entire delivery team." --Christopher Seliga First Vice President of Tishman Construction in Charge of Scheduling East
[Read More]
Project: One Hyde Park -- London
Where Knightsbridge in London enters Hyde Park, an outstandingly prestigious residential apartment block is now being built. The project, costing in the region of 350 million GBP, is designed to deliver the highest quality accommodation with prices reach
[Read More]
Project: Multiple Highrise Construction Projects Worldwide
"If a picture is worth 10,000 words, what is 10,000 pictures working together worth?" Shawn Pressley, Director of Project Management Hill International Hill International has 2,000 professionals in 70 offices among 30 nations and one of the largest construction claims
[Read More]


Founded in 1988, Objectivity, Inc. is the leading provider of real-time data management solutions for applications rich in complex inter-related data. The company’s flagship product, Objectivity/DB, manages and analyzes very large volumes of complex data and ontologies for event and relationship processing within mission-critical applications. These applications are used in process control, medical and telecommunications equipment, government, internet infrastructure and financial services. The Objectivity/DB platform enables organizations to monitor, analyze and respond by identifying inter-relationships or anomalies, providing real-time intelligence for predictive analysis and decision support.












